Still Finishing the Bathroom
Today I worked on putting the trim back in the bathroom we had to remove to move the vanity.
The vanity has been without trim since the spring.
Whatever right? It's not like our whole upstairs has had trim for the last three years.
But this job was different then most of my trim work. This job required re-using the old trim, cleaning it up some, cutting it to the new size and reinstalling.
Which looks kind of crappy up close, but who's going to get down on their knees in the bathroom and check it out in person - besides my Dad?
With a little caulk, wood filler, joint compound and some paint, it will look good as new.
Not bad considering I had to finish the stair treads & risers, went for a hike, looked at an old farm, and Jen did a second coat of joint compound.
- b
The vanity has been without trim since the spring.
Whatever right? It's not like our whole upstairs has had trim for the last three years.
But this job was different then most of my trim work. This job required re-using the old trim, cleaning it up some, cutting it to the new size and reinstalling.
Which looks kind of crappy up close, but who's going to get down on their knees in the bathroom and check it out in person - besides my Dad?
With a little caulk, wood filler, joint compound and some paint, it will look good as new.
Not bad considering I had to finish the stair treads & risers, went for a hike, looked at an old farm, and Jen did a second coat of joint compound.
- b
0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< JenBob Projects Home
<< JenBob Home